How long would it take me to insulate my loft?

Allow about half a day once you have bought the insulation and cleared the loft of its contents. Remember – you will need one layer of 100mm between your roof joists, then a second layer of 170mm on top (cross layered) to comply with current Building Regulations. Measure the area of your loft and look for the packaging label for the area contained in a roll.

Posted in: Loft Insulation - General FAQ